How AMG Works
Submit. Dispatch. Plan. Move. Close.
The Process
Five steps from request to record.
- 01
Submit
A foreman or superintendent submits a material movement request through the project's designated platform. The request captures who needs the movement, what is moving, where it is going, and when it is needed.
- 02
Dispatch
The AMG dispatch lead receives the request and assigns it to the appropriate operator and rigger team based on equipment, location, and project priority.
- 03
Plan
Before movement begins, the operator and certified rigger verify the load, destination, path of travel, access conditions, and surrounding work activities.
- 04
Move
The AMG team executes the movement while maintaining control of the travel path and the material-handling operation.
- 05
Close
Once the material reaches its destination, the movement ticket is completed and closed. Every movement creates a record.
Project Staffing
Built Around Your Project.
AMG mirrors the customer's project schedule. If the project works days, nights, weekends, multiple shifts, or extended schedules, AMG builds its coverage around those operational requirements.
Standard minimum deployment: three operator/rigger teams, one AMG supervisor, and one dispatch coordinator. Larger projects scale significantly beyond this configuration.
Standard Minimum Deployment
Technology & Dispatch
Every Movement Has a Ticket.
Captured on every request
- Requesting contractor
- Requesting person
- Pickup location
- Destination
- Material description
- Equipment required
- Priority
- Requested time
- Assigned operator
- Assigned rigger
- Status
- Completion time
AMG Dispatch — Live Board
Illustrative sample data
48
Movements Today
17 min
Avg. Response Time
6
Open Requests
42
Completed Requests
82%
Equipment Utilization
9
Contractors Served
| Ticket | Contractor | Pickup | Destination | Material | Equipment | Team | Status |
|---|---|---|---|---|---|---|---|
| MV-1042 | Electrical | Laydown C | Data Hall 2 — Grid F4 | Cable tray, 40 ft bundles | Telehandler | Team 02 | IN PROGRESS |
| MV-1043 | Mechanical | Receiving Dock 1 | Level 2 Mech Room | (6) pallets valves | Forklift | Team 01 | ASSIGNED |
| MV-1044 | Fire Protection | Laydown A | Admin Building | Gang box relocation | Telehandler | — | REQUESTED |
| MV-1041 | General Contractor | Gate 3 | Laydown B | (12) pallets sheet metal | Forklift | Team 03 | COMPLETE |
Data & Accountability
Visibility into how material-handling resources are used.
Project Mobilization
From Contract to Operation.
- 01
Project Assessment
- 02
Material-Handling Demand Review
- 03
Staffing Plan
- 04
Equipment Plan
- 05
Site-Specific Procedures
- 06
Dispatch Configuration
- 07
Team Mobilization
- 08
Full Operations
- 09
Reporting & Continuous Improvement
Talk With AMG
Let's build the operating plan.
Share the schedule, the footprint, and the trades on site. We will define the teams, equipment, and dispatch configuration.